Tuesday, October 18, 2011

Kitchen Catch Up

So here's some of what happened since I last posted.

The floors got refinished in the entire downstairs.



Which meant that the furniture all got piled up in the family room, the only carpeted room. This picture is taken from the doorway because you couldn't get in to the room!





Then, finally, the cabinets went in.



Followed by the counter - Laurent Brown marble.  Yum.





Here's the sink and faucet.





And the almost entirely finished kitchen. The back splash is white.  The LED lights make it look blue in this night shot.  It doesn't look like that in person.

Next time, the rest of the story. . . Mina.



Saturday, June 4, 2011

The Disaster Zone continues

The ceiling in the breakfast area and the kitchen were two different heights, so they both had to come down.  The good news is that the plumbing that had to be moved was more easily routed through the ceiling.   The water pressure in the bathroom is better now, too.  But there's also quite a mess in the laundry room now from streamlining the gas lines and moving the water lines,  which required putting some holes in the ceiling.



Electric is next, I think.  Then floors Thursday.

We also bought knobs for the cabinets today.

Friday, May 20, 2011

Demolition Has Begun

The guys came today.  I think they got a lot done.  Tomorrow they are coming to brick up the window from the outside.



Thursday, January 20, 2011

Wednesday, September 1, 2010

DONE !!!!!


The railing you see on the right has been reinstalled on the stairs.  The edging of the stairs and the threshold are installed.  The only thing left is to sweep and mop (although the installers did a great job cleaning up), and for LBK to install some trim on the risers of the stairs.  They offered to use the metal trim on the edges, but we thought wood would look better.  It will be just 9 or so straight cuts and a few finish nails.  Then we have to put everything back!

I'm currently taking suggestions for new furniture and layouts.  Currently the room holds:
  • sofa
  • loveseat
  • coffee table
  • 6" table that sewing machine sits on
  • Gran's old kitchen table that sits on bed risers to make a cutting/work table
  • the long shelves on the wall
  • 3 Ikea Aneboda wardrobes, 2 singles and a double that hold fabric, books and supplies (ours are light wood tone, not white as they are currently showing)
  • a small bookcase
Everything is old, used and repurposed, which is ok.  But I feel like it's so fresh and new. 
I'm thinking:
  • take down the long shelves
  • add white "cube" bookcases on either side of the fireplace
  • create a floor to ceiling design wall to go over the fireplace (it is never used on the advice of the house inspector and it stays plenty warm down there anyways)
  • keep the Aneboda wardrobes, maybe do something with the "windows" in the doors
  • keep the couch and table but move the loveseat to the laundry room "mud room" area and recover both pieces
Unsure about:
  • how to replace the 6' table and kitchen table
  • where to put table(s) in relation to quilting frame if new bookcases are on either side of the fireplace

Monday, August 30, 2010

In Progress

Here's the basement with the skim coat drying.


And one totally unrelated pic of Quincy.

Sunday, August 29, 2010

New Sewing Room Floor

The new sewing room floor is being installed this weekend.  Here's what it looks like before.

Friday, August 6, 2010

New Floor Coming Soon!

We ordered a new floor for the sewing room and I got an email saying that it is in transit.  Whoo hoo!  Unfortunately, that means I have to pack everything up and move it out.  But then I get to move it back onto the new floor.  It's called Mambo Fusion.




Thursday, April 26, 2007

Bathroom Remodel


We just on Tuesday finished remodeling the master bathroom. To be perfectly honest, Zenon, finished the remodel. I mostly sat on the couch and watched three men tromp through the house. There was much sawing, pounding, drilling, tiling, and, I think, cursing in Polish. They did a great job. They were very respectful, knew their stuff, kept me informed (most of the time), showed up when they said they would (or close to it) and kept the place as clean as possible. You can't really expect more than that.

There aren't any ugly before pics, but the tiny fiberglass shower stall was flanked by a cabinet raised off the floor to allow the radiator to pass through to the closet. We discovered that the floor had been raised to accommodate the radiator plumbing, and both the raised floor and the radiator were removed. And the sink, toilet, lights, shower stall, and cabinets. One plaster wall had to be removed, the actual floor opened up, plumbing redone, new studs on the wall that was removed.

Here's what our patio looked like for almost two weeks.


Durock all around.



Then the shower floor and curb built and floor leveled.

Tile installed.





And finally, fixtures.